Tangible's unified data layer lets you filter and scope project data to match specific reporting requirements without redoing the underlying work.
Scoping for standards
Toggle between scopes dynamically — no need to lock in a scope at the start of a project.
Supported scopes (18 predefined):
| Scope | Lifecycle Modules | Building Elements |
|---|---|---|
| CALGreen | A1–C4, excl. B6 | Structure, enclosure |
| SBTi | A1–A5 | Structure, enclosure, interior, services |
| GRESB | A1–A5 | Structure, enclosure |
| Upfront Carbon | A1–A5 | Structure, enclosure |
| Upfront Carbon + Interiors | A1–A5 | Structure, enclosure, interior |
| Upfront Carbon + Operational | A1–A5, B6 | Structure, enclosure |
| Interiors | A1–C4, excl. B6 | Interior |
| Whole Life Carbon | A1–C4, excl. B6 | Structure, enclosure |
| WLC + Operational | A1–C4 | Structure, enclosure |
| WLC + Interiors, Services | A1–C4, excl. B6 | Structure, enclosure, interior, services |
| Toronto Green Standard | A1–A5 | Structure, enclosure |
| ILFI | A1–A5 | Structure, enclosure, interior |
| Canada ZCB | A1–C4, excl. B6 | Structure, enclosure |
| WLC + Parking | A1–C4, excl. B6 | Structure, enclosure |
| Upfront Carbon + Parking | A1–A5 | Structure, enclosure |
| Tangible Standard | A1–C4 | Structure, enclosure, interior, services, sitework |
| Upfront Carbon + Site | A1–A5 | Structure, enclosure, sitework |
| Product Carbon | A1–A3 | Structure, enclosure, interior |
Custom scopes — Request a new scope if your organization or jurisdiction needs a configuration not listed above.
Creating a report
- Admin setup — In Settings, enable the standards relevant to your organization.
- Select scope — On the project page, choose the standard from the dropdown.
- Review — A filtered report view opens, scoped to the selected standard.
- Download — Export the data or capture the report for documentation.
Portfolio aggregation
Carbon data aggregates at the portfolio level for cross-project benchmarking.
- Workspace defaults — Lifecycle scope controlled by Admin settings.
- Published work — Publish or unpublish projects or versions to control what appears in portfolio views and averages (for example, exclude drafts or outliers by unpublishing). Details: Project Versions — published vs. draft.
- Filter by attributes — Asset Type, Location, Data Source, Design Stage, Structure Type.
- Decarbonization chart — Plots projects on a timeline toward 2045 net-zero targets.
- Data export — Structured portfolio data for ESG reports or sustainability audits.